Configuration
| 1. Double-layer steel structure; | ||||||
Model | NBD-HR1200-110TI | ||||||
Electrical Spec | AC380V 15KW | ||||||
Tmax | 1100 ℃(Long time use must be connected with external water cooling device) | ||||||
Max working temps. | 1000 ℃ (Continuous use must be connected with external water cooling device) | ||||||
Heating rate | recommended: ≤ 100 ℃/S | ||||||
Length of heating zone | 200mm | ||||||
Tube size | Φ80*120mm | ||||||
Control system |
| 1. 15 temperature curves can be pre-stored to avoid the trouble caused by repeated setting of different experimental processes; | |||||
Temp Accuracy | +/- 1 ℃ | ||||||
Heating element |
| Infrared tube heating | |||||
Sealing system |
|
|
| ||||
Vacuum degree: ≤5Pa (mechanical pump) | |||||||
Pressure measurement and monitoring |
| The digital display vacuum gauge can make the vacuum degree display in the furnace tube more intuitive and the experimental results more accurate. | |||||
Net weight | 90KG | ||||||
Cautions | 1. When the furnace temperature of the equipment is greater than or equal to 300℃, after moving the furnace, it is forbidden to touch the quartz tube where the original furnace is located to avoid injury;
| ||||||
Service | 1 year warranty with lifetime support (The warranty does not include consumable parts, such as furnace tubes and O-rings). | ||||||
Disclaimer:
The product introduction content of this site (including product pictures, product descriptions, technical parameters, etc.) is for reference only. There may be some difference between the stated content and the actual situation due to the delay in updating. Please contact our customer service staff for confirmation. The information provided by this Site does not constitute any offer or acceptance. NOBODY will improve and modify any information on this site from time to time without prior notice.